2008.RopeClutches 
Holes as seen from the cabin. I drilled the GRP and removed inner deck filling to make room for 25 mm washers and nuts. I applied a lot of silicone to the holes so they were basically filled with it from inside.
Holes as seen from the cabin. I drilled the GRP and removed inner deck filling to make room for 25 mm washers and nuts. I applied a lot of silicone to the holes so they were basically filled with it from inside.
Viewed: 684 times.

8 old holes and 6 new on port deck as seem from the top. Epoxy helped the old holes.
8 old holes and 6 new on port deck as seem from the top. Epoxy helped the old holes.
Viewed: 390 times.

Starboard Spinlock XAS rope clutches installed. From left to right: kicker, first reef, main halyard, topping lift.
Starboard Spinlock XAS rope clutches installed. From left to right: kicker, first reef, main halyard, topping lift.
Viewed: 1188 times.

Powered by Gallery v1 RSS