Holes as seen from the cabin. I drilled the GRP and removed inner deck filling to make room for 25 mm washers and nuts. I applie

Comments

No comments yet.

  •  

Links

BBCode Links

URLs

Photo info

Album Tree

Popular tags

Language preference

Navigator

  • Holes as seen from the cabin. I drilled the GRP and removed inner deck filling to make room for 25 mm washers and nuts. I applie
  • 8 old holes and 6 new on port deck as seem from the top. Epoxy helped the old holes.
  • Starboard Spinlock XAS rope clutches installed. From left to right: kicker, first reef, main halyard, topping lift.